Kitchen Remodeling
Most kitchens take 3–6 weeks depending on scope, materials, and whether walls or utilities are being moved.
Most families stay home. We set up dust barriers and keep a temporary kitchen area available whenever possible.
Yes. We can install materials you have purchased, or source everything for you at contractor pricing.
Bathroom Remodeling
A typical full bathroom takes 2–4 weeks. Smaller refreshes can be completed in about a week.
Yes. We manage the complete scope, including plumbing rough-in, electrical, and any required inspections.
Absolutely. Tub-to-shower conversions are one of our most requested upgrades and a great option for aging in place.
Interior Renovation
Yes. We evaluate whether a wall is load-bearing and install the proper beams and supports when required.
We install hardwood, tile, laminate, and luxury vinyl plank, including subfloor repair and leveling.
Yes. We regularly renovate multiple rooms and entire floors, coordinating every trade under one contract.
Interior & Exterior Painting
Interior rooms usually take 1–2 days each; most exterior homes take 3–5 days depending on prep and weather.
We work with premium Benjamin Moore and Sherwin-Williams products and can match any existing color.
Yes. Patching, skim coating, and trim repair are part of our interior painting service so the finish is seamless.
Roofing & Siding
Curling shingles, granules in gutters, ceiling stains, and missing flashing are common signs. We offer a free assessment.
Most residential roofs are completed in 1–3 days, weather permitting.
Yes. When the damage is localized we repair and color-match, and we only recommend full replacement when necessary.